The construction is progressing!  Scroll down to view pictures from the site which mark the continuing progress.

Thank you for your continued support and prayers.

Evangelical Community Church of Abu Dhabi
P.O.Box 4006
Abu Dhabi, U.A.E.

971-2-446-4563
971-2-445-7416: fax

alumni@eccad.org

 
18 December 2007

The front entrance to the new building.

 
 

 

18 December 2007

Here you see the cabinets lining the corridor of the first floor rooms.

 

 
18 December 2007

The upstairs fellowship area has cabinets and sink.

 
 

 

18 December 2007

This is a glimpse of the new courtyard outside the front of the new building.

 
18 December 2007

The new large worship hall is ready for worshippers.  See the fittings for the new projector in the ceiling. 

 
 

 

18 December 2007

The new fellowship hall in the basement has nice tiling and a spacious cabinet serving area. 

 
10 October 2007

Windows in every opening!  And the moldings around the arches are making the building look finished!

 
 

 

 

10 October 2007

These arches guard the new entrance to the Church building.

 
10 October 2007

Dr. Jim Collins with the construction site manager.

 
 

 

August 10, 2007

The ceiling and recessed lighting in the new worship center.

 
August 10, 2007

The stage area of the new worship center.  If you look carefully you can see the baptismal pool in the center of it.

 
 

 

August 10, 2007

The front corner classroom on the first floor.  See the British School across the street through the window.

 
13 July 2007

Driving toward the church you can see the facade being finished on the end of the building.  The tall tower in the rear accommodates stairs and elevator for apartments on the top floor.

 
 

 

 

13 July 2007

The front is also beginning to take on the finished look.  See the top edging being added.

 
20 April 2007

See the old church building in the far left with the framing for the new front arches glittering in the center and the forms for the window arches to match.

 
 

 

20 April 2007

Pastor Cam inspects the interior of the new worship chapel.  In the far end of the room is, from left to right, the entrance from the foyer, the nursery observation window and the sound room.

 
20 April 2007

The new chapel from the entrance in the back looking toward the new podium.

 
 

 

2 March 2007

Peeking through the new columns you can see the old front door of the church.  Boards in the foreground are used for framing.

 
2 March 2007

Friday morning early service arrivals in the midst of construction of the third level of above ground construction.

 
9 February 2007

Friday morning worship is accompanied with the sounds of construction.  The same man on top of the building is in both pictures.

 
9 February 2007

The same man on top of the building is in both pictures.  You can see the new stairwell behind the man in the red shirt. 

 

 
12 January 2007

The approach to the church on a Friday morning shows the progress of building is now above the roof of the existing building.  if you look between the two tallest street lights, you can see a construction worker on the top of the building.

Please continue to pray for these men and their safety throughout this project.

 
     
 